Tag Archives: Caulfield Racecourse Reserve Trustees

ACTION AT LAST – OPENING UP THE CAULFIELD RACECOURSE

Four years on from the Auditor General’s report we finally see some real action on the opening up of the Caulfield Racecourse.

Within 5 years,  training facilities (tracks and stabling), located on the Reserve’s Crown Land, will be removed and the huge centre of the reserve opened up for public recreation and park usage.

As always information is scant and there are loads of major questions re what this actually means for public usage (staged implementation, development and funding of facilities) vs. those areas of Reserve to be leased for 65 years ( leasing arrangements ie areas, lease fees, terms and conditions).

A huge break, though how huge remains to be seen.  Unfortunately there are many public $’s being directed to Racing, rather than public usage, and another 65 years (up from 21 years) before any “next” break through.

MEDIA RELEASE  

Monday, 22 October 2018

INVESTING IN WORLD-CLASS RACING FACILITIES

The Andrews Labor Government is building new infrastructure and creating hundreds of new jobs at the Cranbourne Training Complex and Pakenham Racing Clubs as part of a major boost for racing in Victoria.

Minister for Racing Martin Pakula today announced a $17.5 million investment to create new facilities at both the Cranbourne Training Complex and Pakenham Racing Club as part of a $40.1 million joint funding package.

Thoroughbred training at the Caulfield Racecourse Reserve will be relocated over the next five years, to open up the reserve for greater public access and recreational use.

The Labor Government will invest more than $6 million at the Cranbourne Training Complex for the construction of additional stabling, an inside grass track, an equine pool and tunnel upgrades to accommodate additional horses.

More than $8 million will also go to the Pakenham Racing club for new stabling, new uphill grass and synthetic tracks and an additional equine pool. The project will accommodate an additional 600 horse boxes and create up to 200 new jobs during construction, with a total economic impact estimated to be more than $250 million.

Racing Victoria and the Melbourne Racing Club will contribute $22.6 million towards the project. Works at both facilities will begin immediately, to help relocations which may begin from mid-2020. Trainers will have up to five years to relocate from their existing facilities at Caulfield Racecourse Reserve.

The Government has approved a long-term lease between Caulfield Racecourse Reserve Trust and the Melbourne Racing Club to increase recreational opportunities and secure horse racing at the reserve for another 65 years.

As part of this, the Government will provide an additional $1 million to support the Trust to develop a long-term land use plan for the site, to open up the space and balance the needs of residents, racing stakeholders and community groups.

The Trust will develop a three year corporate plan that will set out the strategic direction and management of the reserve in close consultation with the local community.

Quotes attributable to Minister for Racing Martin Pakula

“We’re investing in world-class facilities for the future at the Cranbourne Training Complex and Pakenham Racing Club to ensure that Victoria remains the premier racing state.”

“These new facilities will create hundreds of new jobs, provide a major economic boost for the racing industry and help ensure thoroughbred racing in Victoria keeps pace with international standards.”  

Quote attributable to Minister for Environment Lily D’Ambrosio

“Through our legislation and the new long-term lease, we’re delivering on our commitment to establish a strong future for a more accessible Caulfield Racecourse Reserve.”

 Quote attributable to Member for Cranbourne Jude Perera

“Thoroughbred racing is a vital part of our community and this major investment will provide local jobs and ensure these facilities remain world class for years to come.”

 

 

 

MEET THE NEW TRUSTEES OF THE CAULFIELD RACECOURSE RESERVE

This posting serves as a reminder to those who were notified of the below Information Session and to extend the invitation to attend to others interested redressing Glen Eira and Stonnington’s chronic shortage of parkland and sporting facilities.

 

 BACKGROUND

As per the 2014 Auditor General’s Report, due to poor management of Reserve (the former Trust) and lack of oversight (by successive State Governments) has enabled its racing purpose to dominate the Reserve’s 54 hectares to the detriment of its public park and recreation purposes.

Current usage arrangements, have not changed from those outlined in the 2014 Report* and while the wheels of Government have moved slowly they have moved.  In September 2017, on the recommendation of a bipartisan working group legislation was introduced to

  • abolish the previous trust ( a Restrictive Trust) and establish a new trust framework, and
  • establish a transparent and modern governance model for the Reserve management.

 While it’s still “early days”,  the Information Session is the first step in a long process that gives the community an unprecedented opportunity for input into ensuring future Reserve usage recognizes and serves the needs of the community.

 INVITATION

The newly appointed (1st August, 2018) Trustees of the Caulfield Racecourse Reserve have committed to holding three to four community information sessions a year plus an annual public meeting to engage and be transparent with the community about the management of the reserve.

Below is an invitation to the first community information session to be held on 4 October 2018 at the Caulfield Racecourse Reserve.

The meeting will discuss the priorities the Trust has set for the next twelve months; including appointing a Chief Executive Officer and developing a land management plan, so come along meet the new trustees and ask questions.

Register your attendance via the link at the bottom of the above invitation and please circulate amongst your community.

Please note:   An alternate registration link is   Community Information Session: Caulfield Racecourse Reserve.

*****************************

Footnote:

 As per the 2014 AG’s report (which remains unchanged) usage of the Reserve’s 54 ha (valued in 2014 as $2bn) is

  • 11 hectares (20%) is under lease for racing purposes.  The Annual rental of $170K is generally returned to the MRC for racing related projects.
  • 37 hectares (69%) is used for racing purposes without any clear legal entitlement or payment arrangement, and
  • only 6 hectares (11%) is available as open space for the potential use of the community. That 6 ha comprises facilities that do not meet the needs of community, are not easy to physically access and are subject to restricted usage times.  No similar accessibility issues and time restrictions are applicable to racing usage.

Caulfield Station Precinct* Structure Planning – Community Workshop

“The Victorian Planning Authority is leading the preparation of a structure plan for the Caulfield Station Precinct, in partnership with Glen Eira City Council, Stonnington City Council, the Department of Environment, Land, Water and Planning (DELWP) and Transport for Victoria (TfV).

 You are invited to share your thoughts and ideas about how to best shape the future of this place for the community by attending a Community Visioning Workshop.

The purpose of this workshop is to inform the community of the planning process and to seek views and input into the future of the area.

 Registrations are essential.   Light refreshments will be provided.”

Date: Wednesday 20 June 2018
Time: 6.30 – 9.00pm
Location: Monash University Caulfield, Ground Floor, Building H, Room H116 (Caulfield Campus Map)

GERA strongly urges both Glen Eira and Stonnington residents and recreational/sporting groups and clubs to attend this workshop  to get an understanding of what is being proposed and an awareness of it’s potential “flow on” impacts for surrounding areas.

We also encourage completing the VPA online survey.   

 *****************************

 

This the first opportunity for the community input into the development of Structure Plans for the 122 ha Caulfield Station Precinct* and its surrounding areas since the VPA was appointed to lead the planning exercise in August, 2017.  At that time the VPA advised that

“Several key activities attract workers, residents and visitors to the area including Monash University’s Caulfield campus, Caulfield Racecourse, Glen Eira College, retail outlets, parks and recreational areas. The structure plan will promote transit-orientated development and identify opportunities for growth in employment, education, housing and associated activities. We will also work with the Melbourne Racing Club and our government partners to seek to unlock future shared recreational use of racecourse land.”

The initial information and input session focuses on the four core activity centre components and their connectivity within the precinct. The significant planning and development implications for Glen Eira (south of Dandenong Road) and Stonnington’s (north of Dandenong Road) surrounding commercial/residential areas and proximate activity centres are to be included in subsequent consultations.   Recent multi storey multi unit developments, along the northern side of Dandenong Road, indicate the development potential of the areas surrounding the precinct.

Briefly, the four core components of the Caulfield Station Precinct are

Caulfield Village

A major residential, retail and commercial development located between the Racecourse and the Rail Line. Currently under construction, it comprises

Worth noting is the redevelopment potential (multi-storey multi units) of MRC freehold land located along Kambrook/Booran Roads (shown on the above map as Horse Training and Stabling).  This potential was flagged during the Strategic Land Management consultations conducted by the former Reserve Trustees in 2015.  The current status of redevelopment plans is not known.

Monash University – Caulfield Campus

Unfortunately, 10 months into the Structure Planning  process,  little is known of the current redevelopment plans.  As an indicative guide, some years ago redevelopment included

  • an expansion from 10,000 Effective Fulltime Students (EFS) to 25,000 EFS.
  • Construction of a series of high rise buildings to provide educational and administrative facilities with some retail facilities at ground level.
  • Off campus multi storey student accommodation in close proximity to the Caulfield Campus

Caulfield Racecourse and Recreation Reserve

The Racecourse comprises 54 ha, of the 122 ha now designated the  Caulfield Station Precinct, and offers a significant open space opportunity for Glen Eira (which has the least per capita open space/parkland in Metro Melbourne, coming in at less than half the Metro average) and Stonnington (which has the 2nd least).  Both the size and location of this crown land make it suitable to service the recreational (passive and active) needs of the volumes (ie. residents, students, workers and patrons) expected to access the Precinct, as well as the needs of the increasing residents of the surrounding areas.   Striking an equitable balance between public recreational usage and racing usage has long been a contentious issue and recently resulted in changes to management of the land that have yet to come into effect.

Caulfield Station

While GERA is not aware of plans to redevelop the heritage listed Caulfield Station, we believe its redevelopment (presumably as a rail/tram/bus interchange) will be required to service the public transport needs of those accessing the Precinct.   When/if redevelopment occurs, it should include the “place making” historic Station and heritage listed buildings in Derby Road.

Connectivity of Core Components

Currently, the connectivity of the above core components is poor.  It is restricted by the extremely divisive railway line and a fragmented road network.   While access between Caulfield Village, the Racecourse and the Station is basically “across the street”,  accessing Monash from these locations is restricted to 3 underpasses ie. Queen Avenue, Caulfield Station and Station Street.    Free movement flows (predominantly pedestrian, with some vehicular movement for the provision of goods and services) within the Precinct is essential to enable synergetic development of precinct facilities (eg. auditoriums, open space and car parking)  and ensure the long term viability of a cohesive activity centre.

***********

Footnote:

*Caulfield Station Precinct – is the previous Priority Development Zone, known as the Phoenix Precinct (ie. Caulfield Village and Monash University Caulfield Campus) expanded to include the Caulfield Racecourse & Recreation Reserve, Glen Eira College and Glen Huntly Park.

 

CAULFIELD RACECOURSE REQUIEM

The Victorian Parliament is currently debating the “Caulfield Racecourse Reserve Bill”  that arises from the scathing 2014 Auditor General’s Report into the “Management and Oversight of the Caulfield Racecourse Reserve”.    It’s taken 3 years to get to this point and it’s our assessment that the Bill misses the point.

Since the Auditor General’s Report much has be promised, yet it is hard to relate those promises with the content of this Bill.  Rather than addressing the inequity between the Reserve’s three separate yet equal purposes of “racecourse public recreation ground and public park” by aligning Racecourse and Community usages with those purposes, we argue that the Bills provisions favour racing rather than public interests and fall short of  addressing the issues raised in the Auditor General’s Report.   For example,

  • the purposes have been redefined to align more closely with existing inequitable uses and the Minister is given the authority to assign/vary the weightings assigned to the purposes.
  • Ministerial appointment of Trustees, without adequately defining selection criteria.  Appointment is for a period of 3 years with re-appointment for an indefinite number of terms is permitted.
  • Ministerial determination of lease periods of up to 65 years.  This is contrary to past practices and inconsistent with commercial practices and the Reserve’s defined purposes
  • Inadequate management and financial reporting requirements (both Parliamentary and Public) which are not in line with contemporary practices.  Likewise with Conflict of Interest provisions.
  • Provides for a 20 year Strategic Land Management Plan that lacks performance reporting requirements and can be amended without public scrutiny.
  • Ministerial determination of allowed activities – “detrimental” is a key determinant, however, detrimental is not defined.

The inadequacies of the Bill, combined with the Government’s  planned dramatic increases in commercial, residential and educational activities in an area widely known to be lacking in parkland and sporting facilities, has prompted both the Stonnington and Glen Eira residents groups to jointly conduct this event.

As per the Auditor General’s report, the Caulfield Racecourse and Recreation Reserve, has three separate yet equal purposes – racecourse, public recreation ground and public park.  As a result of poor performance by the Trust (in managing the reserve) and successive State Governments (in overseeing Reserve Management) Racing has been permitted to dominate the Reserve to the extent that current usage of the reserve’s 54ha (valued at $2bn+) is allocated as

  • 11 hectares (20%) is under lease for racing purposes.  The Annual rental of $170K is generally returned to the MRC for racing related projects.
  • 37 hectares (69%) is used for racing purposes without any clear legal entitlement or payment arrangement, and
  • only 6 hectares (11%) is available as open space for the potential use of the community.   That 6 ha comprises facilities that do not meet the needs of community, are not easy to physically access and are subject to restricted usage times.  No accessibility issues and time restrictions are applicable to racing usage.

JOIN US IN REMINDING OUR POLITICIANS OF THE FORESIGHT OF OUR FOREFATHERS.  

In 1884, 8 years after the management of the Caulfield Racecourse Reserve was vested in a Board of Trustees, the Victorian Amateur Turf Club (VATC) sought sole management of the Reserve.  The response from the then Minister for Lands was:

“…. he thought the public ought not to have to ask for permission to go on a public reserve” … and …”The vicinity of the Caulfield racecourse would no doubt soon be thickly populated, and the value of the reserve to the public would then be widely enhanced”.  

THAT TIME HAS ARRIVED.  

****************

The “Requiem” will be held in the Centre of the Racecourse.   The Centre may be accessed by the

  • Glen Eira Road Tunnel – vehicle and pedestrian access
  • Guineas Tunnel, Neerim Road and Queens Avenue Gates.

 

 

 

Caulfield Racecourse Reserve – Community Gathering 15/02/2017

2017-02-gathering-flyer-p10001

For those who don’t know in 1858 a Crown Grant established the Caulfield Racecourse and Recreation Reserve with 3 separate yet equal purposes – racecourse, public recreation ground and public park (Caveat on Title).  Yet over the past 20  years lack of oversight and mismanagement (State Government and Board of Trustees) has allowed racing and racing’s commercial activities to dominate the reserve to the exclusion of the public park purposes.

racecourse-2

The scathing September, 2014 Auditor General Report into the management of the reserve graphically identified the current  imbalance in usage of the Reserves 54 ha (valued at $2bn), that has resulted from that lack of oversight and mismanagement, as being

  • 11 hectares (20%), is leased by the Melbourne Racing Club (MRC) for a flat rate of approx. $170,000 p.a.
  • 37 hectares (69%) is used by MRC without any clear legal entitlement or payment arrangement.  (GERA comment – to put this 37 hectares in perspective, it is roughly the equivalent to the combined size of Glen Eira’s two premier parks – Caulfield Park (24.9ha) and Princes Park (12.4ha.)
  • 6 hectares (11%) is open space for potential use by the community on restricted days at restricted times. Use of the racecourse parkland by the public is not actively promoted nor visible from the surrounding streets.  It is also difficult to physically access and comprises limited facilities that don’t meet park users’ needs.

It is now almost 2.5 years  since the AG’s Report and, although “opening up” the Reserve for public use by the surrounding communities of Glen Eira and Stonnington would be significant*, only scant information is available on progress and little has been achieved at “ground zero”.  Therefore, GERA, in conjunction with the Malvern East Group (a.k.a. Stonnington residents group), invites you to a Community Gathering at Caulfield Racecourse between 6.00 & 8.00 pm on Wednesday, 15th February, 2015.

The purpose of this event is twofold

  • To increase community usage of the our parkland by
    • Increasing community awareness of the 2 public park purposes of this Reserve and
    • Providing an opportunity for the community to visit the park and experience it’s magnitude and beauty.
  • To provide local residents with an opportunity to join the campaign seeking increased State Government actions, that are geared to
    • redressing the imbalance in racing vs. public usage of this public land, and
    • ensuring compliance with the Auditor General’s recommendation for open and transparent management this public land.

We hope you will be able to attend.

Public Parkland Access Point Details & Opening Hours

wp_20170203_004-2

****************************************

*Significance of “Opening Up” the Reserve

  • Glen Eira has the least per capita open space in Metro Melbourne, Stonnington the second least
  • Caulfield Racecourse is located
    • just south of Dandenong Road which is the boundary between the two municipalities.
    • Residents in both Municipalities experience adverse amenity impacts (traffic, parking and noise) from racing and racing commercial events.
    • In both Municipalities, the residential areas surrounding this small stretch of Dandendong Road are targeted for, and are currently experiencing, high density growth.

Caulfield Racecourse trustees face sack in community push for more open space

Just published in The Age  – after 140 years, and almost two years after the scathing Auditor General’s Report (17/9/2014) on the Management Performance of the Caulfield Racecourse Reserve Trust, it looks like the State Government is taking the first step in ensuring this Crown Land (valued at $2bn) is governed in accordance with it’s 3 specific purposes of racecourse, public park and public recreation ground.

*********************

The AGE article –  Farrah Tomazin – August 20 2016 – 4:18PM

A powerful board that manages the Caulfield Racecourse faces being sacked after years of “unworkable” governance, paving the way for one of Melbourne’s best kept secrets to be opened up for greater public use.

In a move likely to be welcomed by residents, the Caulfield Racecourse Reserve – the equivalent of about 15 MCGs worth of open space – could soon be utilised for more recreation, local sport and much-needed parkland in the heart of inner-city suburbia.

Racecourse Centre

An aerial view of Caulfield Racetrack. Photo: Google Earth

The reserve is home to premier racing events such as the Caulfield Cup and the Blue Diamond Stakes, but the land was put aside a century ago for broader community use, not just the city’s sporting elite.

However, most Melburnians would not know they can simply walk in and use the space, largely because the governing board – made up by a secretive group of trustees heavily influenced by the powerful Melbourne Racing Club – has made the site look unwelcoming and managed the area for years to serve its own interests: predominantly training and racing.

A bipartisan panel set up by the Andrews government earlier this year has now branded the trustee structure “unworkable” and “anachronistic”, and called for a new independent body to manage the reserve.

The panel’s report, seen by The Sunday Age, suggests the government could first request the resignations of the trustees, whose 15 members comprise six MRC nominees (including chair Mike Symons and vice-chair Peter Le Grand); six government nominees (including former ALP national president Greg Sword and federal court judge Shane Marshall) and three from the Glen Eira Council.

If the trustees don’t stand down legislation would be introduced giving the minister the power to dissolve the group and set up a new, clearer governance structure based on bodies such the Melbourne and Olympic Parks Trust or the MCG Trust. In the meantime, the department of environment would be appointed the interim land manager.

Environment Minister Lily D’Ambrosio said she was considering her options and would respond shortly.

“This historic issue has been languishing for far too long and requires decisive action,” she said. “We must ensure there is a balance between the needs of the racing community and local residents.”

A key problem with the governance of the Caulfield Racecourse Reserve is the trust is the landlord and the Melbourne Racing Club its tenant – yet six of the 15 trustees also happen to be MRC appointments.

The composition of the group has therefore resulted in perceived and real conflicts of interest, a lack of accountability, and unresolved disputes between trustees on everything from the lease arrangements to how the area should best be used.

The City of Glen Eira has the least public space of any municipality, and councillors have previously pointed out there were about 400 children unable to play sport in the area last winter because they simply didn’t have the room.

Liberal Caulfield MP David Southwick – part of the working group, along with Labor Oakleigh MP Steve Dimopoulos and independent chair Ken Ryan – told Fairfax Media: “The Andrews government must act immediately and implement the working group’s report and sack the Caulfield Racecourse Trust to restore appropriate governance and to unlock this prime open space for the community.”

Mr Dimopoulos said it was crucial the MRC deliver on a plan to remove training from the site within five years, to allow sports grounds to be established around the reserve.

The skewed way in which the reserve has been managed was highlighted in a 2014 Auditor-General’s report, which found 37 out of the reserve’s 54 hectares were being used by the MRC for racing and training “without clear legal entitlement or transparent arrangements in place that recognise the financial benefit to the club”.

A further 11 hectares were leased to the MRC. But only six hectares were identified as space the public could use – if they managed to navigate their way past the poor signage and unwelcoming access points.