Tag Archives: glen huntly reservoir

THE “REAL” 2013 INCREASE IN OPEN SPACE

Those of you who have been following our previous posts on the 2013 Draft Open Space Strategy will be aware that GERA has been requesting details of the strategy’s reported 11.9 ha (119,000 sqm) increase in Glen Eira’s Open Space from that reported in the 1998 Strategy.  GERA’s initial (3/12/2014) and follow-up requests do not stem from a desire to  “nitpick” but rather a belief that the practice of “good governance” (and its principles of openness, transparency and accountability) requires advising the community when a change of definitions has occurred and providing an analysis of the impact of the definitional changes when presenting documents to the community.  The significance of Glen Eira’s well documented lack of open space* and the community’s long held and well expressed governance concerns adds emphasis to this requirement in this instance.

GERA received the requested details (ie. the 1998 Open Space Strategy’s Working Paper C – Public Open Space Inventory and Inventory of Buildings within Open Space Areas last Friday (7/2/2014) and has undertaken Council’s recommended D.I.Y. (Do It Yourself) comparison/reconciliation.

The comparison/reconciliation results are very disconcerting due to the disparity of the results;  area differences are recorded for most parks (whatever the size) and those differences are often contrary to expectations.  The statement that “From these definitions it can be deduced that the 1998 strategy did not include Council leased facilities such as tennis courts, bowls clubs and croquet, etc.”  indicates a reasonable expectation of area increases in those parks with such facilities and a zero area change to  those parks without such facilities.  Yet surprisingly, and inexplicably, this is not necessarily the case.  For example, Bailey Reserve records an area decrease of 1.37 ha or 13,700 sqm, Duncan McKinnon Reserve records an area decrease of 0.27 ha or 2,700 sqm, and the Glen Rigney Memorial Reserve has doubled in area – 1998 0.03 ha or 300 sqm to 0.06 or 600 sqm in 2013.  There are numerous other such discrepancies. 

Such unexplained anomalies raise many questions re the detailed knowledge and management of Glen Eira’s extremely valuable open space assets and the validity of the data presented in both strategies.  While doubts may be readily cast on of the 1998 Strategy,  doing so legitimately raises additional questions related to the time elapsed (16 years) to identify the 1998 “errors” and the validity of park master plans (all based on the 1998 strategy and which Council indicates are strictly adhered to, eg. the recent controversial Caulfield Park tree removal).

With reference to our earlier posting querying the 11.9 ha (119,000 sqm) increase, please note the following results recorded in GERA’s comparative analysis of the 1998 and 2013 surveys

  • Mallanbool Reserve (2.21 ha or 22,100 sqm) was not included in the 1998 survey and is a valid addition to Glen Eira’s open space in the 2013 Strategy.
  • Even without detailed data,  a rough calculation that factors into the 11.9 ha (119,000 sqm) increase
    • the unexplained reduction in the Bailey (1.37 ha) and Duncan McKinnon Reserves (0.27) and East Boundary Road Reserve (2.46 ha), and
    • the addition of Mallanbool Reserve (2.21 ha), Booran Road Reservoir (1.7 ha) and Packer Park (1.99 ha**).

indicates that most of the net 11.9 ha increase is attributable to “definitional change” and  highlights the governance aspect raised above.

It also highlights GERA’s comment, included in our  submission to the 2013 Draft Open Space Strategy  that Council’s exclusion of the Centre of the Caulfield Racecourse on the grounds of “restricted public access” is fundamentally flawed when the “definitional change” allows for the inclusion of leased facilities that cumulatively approach the Centre in size yet have more restrictions to public access than does the Centre.

**  the reported increase in Packer Park (1.99 ha, 19,900 sqm) includes the purchase of two house lots and the previously leased bowls club that Council proposed to sell to raise funding for the purchase and rehabilitation of the 2 house lots.  Generously assuming that the house lots comprised 0.4 ha (4,000 sqm), the remaining 1.5 ha (10,500 sqm) of the 1.99 ha increase constituted Council owned and leased land and as such is considered to be a definitional change.  Under the revised definition of open space, had the  Bowls Club remained it would have been included in the 2013 Strategy.  Council’s rehabilitation works changed public accessibility rather than the area’s definition status.

Packer Park labelled picture T

GERA believes that, as mentioned in our previous posting, in the 16 years since 1998 little has been achieved with regards to increasing Glen Eira open space and that which has been achieved has been primarily the result of government grants and which have not been augmented by Council actively seeking purchasing opportunities.  In the past 16 years, open space acquisitions (ie. “real” rather than definitional) have been limited to the

  • Mallanbool Reserve (2.21 ha, 22,100 sqm) – Crown land (State), management rights granted to Council
  • Booran Road Reservoir (1.73 ha, 17,300 sqm) – Crown land (State), management rights granted to Council in 2010 – rehabilitation works scheduled to commence in 2015/2016.
  • 2 Packer Park house lots of unknown area (assumed to be 0.4 ha or 4000 sqm – refer above) purchased in 2011 ($1.911m).

This limited achievement comes despite residents continually expressed open space long term goals, a rapidly rising population and Council statements recognising Glen Eira’s need for increased open space and promises of active acquisition (via purchase and government grants).  The 1998 strategy’s “suggested” expenditure of the developers open space contributions as 50% split between acquisition and existing park improvements has been ignored.  Aside from the Packer Park house lots, open space contribution ($12.8m for the period 2003/4 to 2011/12) has been spent on capital works in, or maintenance of, existing parkland.  This is an imbalance that needs to be rectified.

GERA re-iterates the points made in our 2013 Open Space Strategy Submission (insert link)

  • Increased frequency of Open Space Strategy reviews
  • Open Space Contributions to be held in reserve for the purchase and rehabilitation of the purchased additional parkland.
  • Regular reporting of open space contributions – revenue received and expenditures
  • Ensure that the current maximum open space contribution rate of 5% of unimproved land value to applied to all multi unit developments within Glen Eira as a priority.
  • Council should join with other Councils currently advocating to the State Government for higher open space contribution rates to apply to Commercial and Mixed Use Zones (currently exempt from open space contributions)

In addition GERA also advocates that, in line with good governance practices, Council advises the community when definitions change and provides an analysis of the impact the changes.

 ***********

Footnote:

* Glen Eira has the least per capita open space ratio in Metropolitan Melbourne which, at 1.4 ha per 1000 population, is approximately half of the average ratio for Metro Melbourne.

OPEN SPACE – ANOTHER OPPORTUNITY LOST?

Late yesterday, GERA received a letter, from Mayor Jamie Hyams,  in response to our letter (6/12/2012 refer below posting) which

  • alerted Council to the opportunity to purchase 3142 sqms of cleared open space abutting Riley Reserve, Murrumbeena (namely 487 Neerim Road, Murrumbeena)
  • outlined the benefits of acquiring the property, located within easy walking distance of the Murrumbeena, Hughesdale and Dandenong Road Housing Diversity (high density) areas.

Unfortunately, Council has decided not to purchase 487 Neerim Road, Murrumbeena.   Although located in a minimal change area and a rare opportunity to acquire a sizeable addition to the Municipality’s open space (at approximately 50% of the Melbourne Metropolitan average per capita open space, Glen Eira has the least open space in the metro area), Council argues financial considerations prevent the acquisition of this property.  Hence a valuable open space opportunity will be lost forever to high density development (as emphasised in the below sale advertising material)

Advertisement

The following is GERA’s response, dated 15/12/2012, to the Mayor’s letter.  The response has been forwarded, via email, to all Glen Eira Councillors.

**********************

Dear Mayor Hyams,

Thank you for your 14th December, 2012, response to our recent letter (6/12/2012) alerting Council to a rare opportunity to acquire additional parkland (487 Neerim Road, Murrumbeena).  While GERA accepts that Council (like every organisation and individual) has finite resources and needs to prioritise those resources, Council (like every organisation and individual) also needs to retain a degree of flexibility so that unexpected/unplanned opportunities can be capitalised.  For the reasons outlined in our above mentioned letter (copy attached), GERA believes that acquisition of 487 Neerim Road is one such unexpected/unplanned opportunity and requests Council reconsider it’s decision not to purchase the property.

In a point by point response, to your letter (14/12/2012) GERA respectfully submits the following

  •  Packer Park Acquisition  

While GERA does not contest the distinction between our wording of the 2 house lots “adjoining Packer Park” vs. your wording of “jutted in to the park”, GERA points out that the property at 487 Neerim Road is considerably larger than the 2 house lots, has the added benefit of possessing mature native vegetation and additionally is not encumbered by the presence of buildings.  The Neerim Road property estimated price of $2.2m+ therefore compares favourably with the Packer Park house lots (almost $2m) which required demolition and rehabilitation works.  Since the former bowls green at Packer Park was Council property (which it is noted Council originally proposed to sell to fund the acquisition of the 2 house lots), no acquisition costs were incurred.

  • Former Glen Huntly Reservoir (also known as the Booran Road Reservoir) 

In the period 2006/8, the Glen Huntly Reservoir was declared surplus to South East Water requirements and an “ïn principle” agreement to transfer the land to Glen Eira Council for conversion to public open space was made.  In March, 2008 (prior to the November, 2008 Council elections) Council held a public consultation on proposed usage at which residents voted overwhelmingly against selling the reservoir site for development and in favour of conversion to parkland.   In 2010, the wheels of government moving slowly, management responsibility (not ownership) for the land was officially transferred to Glen Eira.

Council’s 2012 10 year Strategic Resource Plan includes the following budgeted amounts for reservoir conversion – 2017/18 $4m, 2018/2019 $3.5m.

While GERA welcomes the addition of this new park, particularly as it is located in the Glenhuntly Housing Diversity (high density) area, GERA recognises that, unlike 487 Neerim Road, acquisition of the reservoir site is a planned opportunity and that the proposed new park will not become a reality for some considerable time.

  •  Council Advocacy

GERA supports Council’s advocacy for the Caulfield Racecourse Centre and the Elsternwick Plaza.  However, it is noted that neither are new parks, or involve additional parkland.  Additionally, Council advocacy for these two parks is not new – Council advocacy for the two was included in the soon to be replaced 1998 Open Space Strategy.

 In relation to the centre of the Caulfield Racecourse, Council’s 2011 agreement with the Melbourne Racing Club appears to have stalled since improvements (eg. removal of the Queens Avenue palisade fencing) have failed to meet their scheduled completion date.

  • New Open Space Strategy

As with Council Advocacy, GERA welcomes and supports the proposed new Open Space Strategy.  Replacement of Council’s 1998 Open Space Strategy is long overdue as, over the past 14 years, the policy has failed to keep pace with Glen Eira’s population growth and the changing needs (re parkland requirements and parkland usage) that accompanies such dramatic population growth.

While GERA notes that the 2012 Community Plan includes the broad statement that “Council will actively seek new opportunities to increase and optimise open space for residents”, GERA is concerned that your statement that “New open space may well be of even greater priority than enlarging existing open space” may imply a limitation on which open space opportunities will be considered.  Admittedly, the open space is not evenly distributed across the municipality and open space opportunities should be pursued in those areas with little or no open space.  However, this should not preclude significant open space opportunities in other better served areas, particularly when

      • those areas are zoned for dramatic current and future population growth and
      • open space accessibility, within the area or suburb, is restricted by railway lines.

GERA would welcome the opportunity to further discuss this issue, and the related issue of funding of future open space acquisitions, with Council.

  •  Open Space Improvements 

GERA acknowledges that Glen Eira’s limited open space is well maintained and that open space maintenance involves considerable expense.  It should be noted that residents question some of Council’s maintenance decisions (e.g. installation of concrete plinths, pavilion expansions), particularly when the expenses incurred by those decisions are seen to prevent or limit acquisition of additional open space.

 The need for flexibility and willingness to take advantage of unexpected open space opportunities, is reflected and highlighted by your mention of the $1.1m Murrumbeena Play Space Project   The Murrumbeena Play Space Project experienced a “leap forward” in the priority list when the unexpected State Government Grant ($259K) was announced and Council was able to unexpectedly provide the additional $850K required.

  •  Council Borrowings

Repayment of the GESAC loan (budgeted to be $23.4m at the end of the 2012/13 financial year) should be an issue for Council.   However, given

      • Council’s confidence that GESAC revenues will rise to cover not only running costs but also interest and principal repayments and
      •  the currently budgeted 2012/13 financial year surplus of $6.87m

brings into question Council’s focus on GESAC debt reduction at the expense of acquisition the 487 Neerim Road property.

  • Defined Benefit Fund

GERA seeks clarification on the $7.1m fund shortfall and its impending payment mentioned in your letter.

The July 2012 fund shortfall announcement was featured in a Glen Eira Leader Article dated 14th August, 2012.  In this article Council spokesman Paul Burke said “Council directors had identified the shortfall risk last year, and had put $3 million into its 10-year Strategic Resource Plan” … He said “$4.1 million now had to be found with the shortfall paid over 15 years

The clarification GERA seeks is the related to reconciling the significance and urgency applicable to payment of the Defined Benefit Fund shortfall as outlined in your letter and the Leader Article.

  • Rates

In order to remain focussed on relevant issues, GERA will refrain from commenting on the past election campaign matters raised in your letter.  Suffice it to say, that unexpected/unplanned open space acquisitions should not be seen to automatically result in increased rates or rate increases that are higher than expected – particularly in light of the following points:

      • with a budgeted 2012/13 financial year surplus of $6.87m,
      • the impending success of GESAC and
      • a 10 year Strategic Plan that provides for annual rates increases of 5-6%

As mentioned in this letters introduction, Council also needs to retain a degree of flexibility so that unexpected/unplanned opportunities can be capitalised. The closing comment that “Council’s priorities will be to adopt and implement a prioritised and costed plan to meet the communities need for public open space” does not reflect the community’s open space aspirations included in the 2012 Community Plan nor does it reflect unplanned/unexpected nature of open space opportunities.   Without the flexibility and willingness to take advantage of open space opportunities as they become available, Council’s vision is incomplete and the community’s needs will never be met.

As time is of the essence (487 Neerim Road, Murrumbeena is to be auctioned 20/12/2012) GERA urges Council to

  • consider the acquisition advantages outlined in our 6/12/2012 letter,
  • consider the points raised above and to
  • reconsider it’s decision not to purchase 487 Neerim Road.

GERA looks forward to receiving Council’s response to this letter.

Yours sincerely,

Don Dunstan,

President,  Glen Eira Residents Association (Reg. No. A00390820L)

Box 212 Elsternwick, Post Office, 3185 Victoria

Cc:  All Councillors via Email, Glen Eira Residents via GERA website posting

BOORAN ROAD RESERVOIR CONCEPT PLANS CONSULTATION

Last Wednesday’s (13/6/2012) Booran Road Reservoir Concept Plans  Consultation gave residents the opportunity to confirm the views they expressed at the March, 2008 consultation (Friends of Glen Huntly Reservoir website – FOGHR) – this they did.   The majority of the 50+ attendees preferred the passive recreation option over the active or mixed options.

Booran Road Reservoir – Background

The Booran Road Reservoir (also known as the Glen Huntly Reservoir) is 1.6 ha of crown land located on the corner of Glen Huntly & Booran Roads, Glen Huntly.  The site shares a rear boundary with Alamar Ave and abuts nine properties along Roseberry Grove.

The reservoir has not been used to store water since the 1970’s.  The site was/is considered to be the last undeveloped piece of land in Glen Eira that can be reverted to publicly accessible open space. Around 2006/8,  the site was declared surplus to South East Water use and in 2010 it was  formally handed to Glen Eira Council by the State Government to manage* as publicly accessible open space.   In March, 2008, given the impending State Government handover, a community consultation was held to discuss proposed uses.   Council presented two options to residents: a) sell the land for development or b) convert the land to passive parkland with synthetic soccer pitch  – residents overwhelmingly voted for passive parkland. 

Booran Road Reservoir

Booran Road Reservoir Concept Plans Consultation

As previously mentioned, last Wednesday’s (13/6/2012) consultation confirmed the 2008 preference for the former reservoir to become passive recreation open space.

The plans presented were described, by the designer (Bill McLaughlin), as being “thoughts at the moment” and, although attendees were asked to indicate their preferred option (passive, active or mixed recreation) the consultation was not a forum to vote on the presented options – it was to gather attendees’ preferences so that they could be incorporated in future park plans. Paul Burke (Director of Community Services) explained that, while Council has budgeted for work to commence on the park in 2016/7, Council was commencing development of the plans well before this time so that the plans could be submitted should a government grant become available.

Given the well documented lack of public open space in the Glen Eira Municipality (a major issue which has continually featured in the Community Plan and the State Government’s Satisfaction Survey since the 1990’s), it is appalling that

  1. Some 4 years on from the initial consultation (or 2 years on from Council securing management responsibility* of the site in 2010)  Council is only now approaching the drawing board.  In November 2009 Council estimated that it would take approximately 2 years to complete construction/landscaping and commissioning of  the park**.
  2. A further 4 -5 years will pass before Council commences work on the park and that the work will take a further 2 years to complete. (Council Meeting Minutes 8th May 2008 – Strategic Resource Plan – 2017/18 budget is $4m, 2018/2019 budget is $3.5m).

That Council (Councillors and Administration) considers that the spending of multi-millions on under-utilized, parkland consuming pavilions is a better use of ratepayers funds than creating parkland (1.6 hectares) in an area targeted for high density mixed use developments does not affirm Council’s claim of reflecting the needs and wishes of residents.    What justification is there for leaving this “windfall” prime land a derelict, frequently vandalised, eyesore for the past 4 years and the next 4 – 5 years.

___________

* “manage” and “management responsibility” gives the land to Council to use and maintain for open space purposes yet retains State Government ownership of the land Council.  Thus preventing a sale, originally proposed in 2008, of the land by Council.

** Extract from Council Meeting Minutes, 24th November, 2009 – Section 8.9

There are 5 distinct phase in a major project like the converting the former Glen Huntly Reservoir to public open space:

1. Feasibility

2. Concept

3. Planning / Design

4. Construction

5. Commissioning

The project is currently in the feasibility phase. The Concept Phase will commence after Council has secured management responsibility over the land and determined how it would like to use it. Phases 2 to 5 are likely to take at least 2 years.

Note: Management responsibility was secured in 2010.

********

The following is a summary of comments made by those who attended last Wednesdays Consultation and are similar to those made at the March, 2008 consultation (Comments from FOGHR ).  The community’s views have not changed. Council was aware of these views 4 years ago yet they failed to materialise in the draft design. Given council’s track record on consultation over design we are not optimistic that anything will be different this time!

Comments:

  • While residents accepted the presented plans as being conceptual they did note that the all three plans were flawed in that
    • Retention of the reservoir walls, to the extent that they are retained, raised serious security issues as they created dark hidden places
    • No car parking provision is included.  The area has very limited on street parking and already demand exceeds supply.
    • No picnic facilities or play ground included
    • Multi use of area’s not taken advantage of – active sports areas could also be used for farmer’s market, outdoor theatre etc.
  • Preference for passive recreation option
    • All three options raise traffic and parking issues in an already congested area, however, the extent of the congestion varies with the use – including active sporting facilities will concentrate that congestion at specific times.  Passive recreation will not concentrate congestion (more even flow of park usage).
    • Including active sporting facilities on the land will diminish the amount of land available for passive recreation by the need to include ancilliary amenities, e.g. change rooms
    • Glen Eira has few passive recreation areas – how much need is there for another sporting facility
    • Passive recreation  use means park will be usable for the maximum number of residents – from the very young to the aged
  • Facilities to be included in plan
    • Community Garden
    • Facilities for family recreation (BBQ’s, picnic area, playground)
    • Jogging and walking tracks around park perimeter
    • Native tree planting with informative plaques
  • Other

Trees currently surrounding the site need attention now.  Tree maintenance undertaken now will generate a 5/6 year head start for the proposed park.