THE “REAL” 2013 INCREASE IN OPEN SPACE

Those of you who have been following our previous posts on the 2013 Draft Open Space Strategy will be aware that GERA has been requesting details of the strategy’s reported 11.9 ha (119,000 sqm) increase in Glen Eira’s Open Space from that reported in the 1998 Strategy.  GERA’s initial (3/12/2014) and follow-up requests do not stem from a desire to  “nitpick” but rather a belief that the practice of “good governance” (and its principles of openness, transparency and accountability) requires advising the community when a change of definitions has occurred and providing an analysis of the impact of the definitional changes when presenting documents to the community.  The significance of Glen Eira’s well documented lack of open space* and the community’s long held and well expressed governance concerns adds emphasis to this requirement in this instance.

GERA received the requested details (ie. the 1998 Open Space Strategy’s Working Paper C – Public Open Space Inventory and Inventory of Buildings within Open Space Areas last Friday (7/2/2014) and has undertaken Council’s recommended D.I.Y. (Do It Yourself) comparison/reconciliation.

The comparison/reconciliation results are very disconcerting due to the disparity of the results;  area differences are recorded for most parks (whatever the size) and those differences are often contrary to expectations.  The statement that “From these definitions it can be deduced that the 1998 strategy did not include Council leased facilities such as tennis courts, bowls clubs and croquet, etc.”  indicates a reasonable expectation of area increases in those parks with such facilities and a zero area change to  those parks without such facilities.  Yet surprisingly, and inexplicably, this is not necessarily the case.  For example, Bailey Reserve records an area decrease of 1.37 ha or 13,700 sqm, Duncan McKinnon Reserve records an area decrease of 0.27 ha or 2,700 sqm, and the Glen Rigney Memorial Reserve has doubled in area – 1998 0.03 ha or 300 sqm to 0.06 or 600 sqm in 2013.  There are numerous other such discrepancies. 

Such unexplained anomalies raise many questions re the detailed knowledge and management of Glen Eira’s extremely valuable open space assets and the validity of the data presented in both strategies.  While doubts may be readily cast on of the 1998 Strategy,  doing so legitimately raises additional questions related to the time elapsed (16 years) to identify the 1998 “errors” and the validity of park master plans (all based on the 1998 strategy and which Council indicates are strictly adhered to, eg. the recent controversial Caulfield Park tree removal).

With reference to our earlier posting querying the 11.9 ha (119,000 sqm) increase, please note the following results recorded in GERA’s comparative analysis of the 1998 and 2013 surveys

  • Mallanbool Reserve (2.21 ha or 22,100 sqm) was not included in the 1998 survey and is a valid addition to Glen Eira’s open space in the 2013 Strategy.
  • Even without detailed data,  a rough calculation that factors into the 11.9 ha (119,000 sqm) increase
    • the unexplained reduction in the Bailey (1.37 ha) and Duncan McKinnon Reserves (0.27) and East Boundary Road Reserve (2.46 ha), and
    • the addition of Mallanbool Reserve (2.21 ha), Booran Road Reservoir (1.7 ha) and Packer Park (1.99 ha**).

indicates that most of the net 11.9 ha increase is attributable to “definitional change” and  highlights the governance aspect raised above.

It also highlights GERA’s comment, included in our  submission to the 2013 Draft Open Space Strategy  that Council’s exclusion of the Centre of the Caulfield Racecourse on the grounds of “restricted public access” is fundamentally flawed when the “definitional change” allows for the inclusion of leased facilities that cumulatively approach the Centre in size yet have more restrictions to public access than does the Centre.

**  the reported increase in Packer Park (1.99 ha, 19,900 sqm) includes the purchase of two house lots and the previously leased bowls club that Council proposed to sell to raise funding for the purchase and rehabilitation of the 2 house lots.  Generously assuming that the house lots comprised 0.4 ha (4,000 sqm), the remaining 1.5 ha (10,500 sqm) of the 1.99 ha increase constituted Council owned and leased land and as such is considered to be a definitional change.  Under the revised definition of open space, had the  Bowls Club remained it would have been included in the 2013 Strategy.  Council’s rehabilitation works changed public accessibility rather than the area’s definition status.

Packer Park labelled picture T

GERA believes that, as mentioned in our previous posting, in the 16 years since 1998 little has been achieved with regards to increasing Glen Eira open space and that which has been achieved has been primarily the result of government grants and which have not been augmented by Council actively seeking purchasing opportunities.  In the past 16 years, open space acquisitions (ie. “real” rather than definitional) have been limited to the

  • Mallanbool Reserve (2.21 ha, 22,100 sqm) – Crown land (State), management rights granted to Council
  • Booran Road Reservoir (1.73 ha, 17,300 sqm) – Crown land (State), management rights granted to Council in 2010 – rehabilitation works scheduled to commence in 2015/2016.
  • 2 Packer Park house lots of unknown area (assumed to be 0.4 ha or 4000 sqm – refer above) purchased in 2011 ($1.911m).

This limited achievement comes despite residents continually expressed open space long term goals, a rapidly rising population and Council statements recognising Glen Eira’s need for increased open space and promises of active acquisition (via purchase and government grants).  The 1998 strategy’s “suggested” expenditure of the developers open space contributions as 50% split between acquisition and existing park improvements has been ignored.  Aside from the Packer Park house lots, open space contribution ($12.8m for the period 2003/4 to 2011/12) has been spent on capital works in, or maintenance of, existing parkland.  This is an imbalance that needs to be rectified.

GERA re-iterates the points made in our 2013 Open Space Strategy Submission (insert link)

  • Increased frequency of Open Space Strategy reviews
  • Open Space Contributions to be held in reserve for the purchase and rehabilitation of the purchased additional parkland.
  • Regular reporting of open space contributions – revenue received and expenditures
  • Ensure that the current maximum open space contribution rate of 5% of unimproved land value to applied to all multi unit developments within Glen Eira as a priority.
  • Council should join with other Councils currently advocating to the State Government for higher open space contribution rates to apply to Commercial and Mixed Use Zones (currently exempt from open space contributions)

In addition GERA also advocates that, in line with good governance practices, Council advises the community when definitions change and provides an analysis of the impact the changes.

 ***********

Footnote:

* Glen Eira has the least per capita open space ratio in Metropolitan Melbourne which, at 1.4 ha per 1000 population, is approximately half of the average ratio for Metro Melbourne.

LOST OPEN SPACE OPPORTUNITY & GOVERNANCE

This is a brief update on our 9th February, 2013 posting. In addition to outlining Council’s failure to purchase the 487 Neerim Road, Murrumbeena property and or discuss the potential purchase, the 9/2/13 posting also raised pertinent questions on Council’s decision making process, namely

o who made the decision?
o what information was provided to ensure an informed, impartial decision was made?
o did Councillors have some input into the decision or were they advised after the decision was made?

The answers to questions 1 and 3 above are answered via the belated inclusion of the the Records of Assembly+ in Council’s just published agenda for next Tuesday’s (26/2/2013) Council Meeting – extracts of Agenda Items 8b i and 8b ii. 

The relevant minutes for the assemblies of 11th and 18th December, 2012 make no mention of any discussion on the acquisition of the 487 Neerim Road property occurring at either assembly. Ergo, the decision (implicit in Council’s 14/12/2012 letter to GERA) not to purchase the property was not made by Councillors and Councillors had no input into the decision.

Given

  • the significance that residents have been placing on Glen Eira’s limited open space in every community/council plan and State Government “Satisfaction Survey” since 1998 – and vocally reiterated in the 2012-2013 Community Plan, and
  • Council’s abysmal performance in acquiring additional open space (since 2003 only the two Packer Park house lots have been acquired for $1.9m.  Yet, for the same period, Council received $12.8m in Open Space Contributions from high density developers).

The failure to discuss with, or involve Councillors in, this open space issue (in either an open Council Meeting or an assembly) raises serious questions on how governance is practiced in Glen Eira.

  • Who makes decisions and on what information is the decision made?
  •         How are decisions communicated to Councillors and residents?
  • What weight is given to the community’s expressed values?
  • Councillors may delegate authority to act on their behalf, however, the responsibility for the actions taken remains with Councillors. How are decisions made under delegations reported to them? What ability do they have to question administrative actions or to raise residents issues at Council (i.e. with other Councillors and the Administration)?

***********

Footnotes:

+ An “Assembly of Councillors”, as defined in the Local Law, is an in camera briefing session, involving both the Administration and Councillors, to enable the Administration to report day to day activities to Councillors and inform (or highlight to) Councillors of current and future significant issues – particularly issues that are likely to be contentious.   As per Local Law decisions are not permitted to be made at Assemblies, decisions can only be made at Ordinary (open) Council Meetings.

 * Delegations of Authority – Delegations of Authority (ie. the instruments which confer on the Administration the authority to act, on behalf of the elected representatives, when undertaking the day to day administrative activities associated with the Municipality)

The Delegations of Authority, Councillors have given to the Administration are wide ranging.   Reporting to Councillors of administrative decisions made, under delegations of authority, is at the discretion of the administration.

Links

To make it easier for readers, GERA has included relevant extracts of the Records of Assembly included the referenced Agenda for the 26/02/2013 Council Meeting.   For those interested, a full copy of the Agenda is available from Council’s website – the relevent Agenda Items are 8b i and ii.

CORRRECTION

GERA’s above posting and our earlier (9/2/2013) posting regarding Council’s decision not to purchase the 487 Neerim Road property incorrectly states that Council did not respond to our 15/12/2012 email.  This is incorrect – the Mayor’s response  is dated 24/12/2012 and GERA apologizes to Council, Members and Readers for this omission.

While GERA accepts responsibility for this omission, GERA contends that the points raised in our various postings for considering purchasing the property remain valid and seriously questions Council’s decision making process and Councillor input into that process.